Beach Colony East

Beach Colony East, Navarre Beach FL

PROJECT

Beach Colony East

Navarre Beach, FL

This repair and maintenance project included replacing all of the existing plastic guard rails with new Kynar finished aluminum guard rails as well as the repair of damaged concrete caused by reinforcing steel corrosion. Also, a silicone elastomeric coating was applied to all of the exterior walls.